Sailing Jibseavídeo

THE REALITY OF CROSSING THE PANAMA CANAL - Ep 207

8 de setembro de 2024 · 15 min · 28K visualizações · Panama Canal

O que este vídeo aborda

A 51-foot Leopard catamaran transits the Panama Canal from the Atlantic to the Pacific Ocean over two days, requiring an official canal advisor and four line handlers.0:04 The crew manages heavy lines by tying bowlines to messenger lines thrown from the lock walls, which are then hauled up by lock attendants to secure the vessel.6:15 During the transit, the boat enters a series of locks—Gatton, Pedro Miguel, and Miraflores—to navigate an 85-foot elevation change between the oceans and Gatton Lake.12:41 Because sailboats cannot transit the canal overnight, the vessel anchors in Gatton Lake for the evening.8:14 The process involves significant waiting periods for tanker traffic and advisor coordination, requiring the crew to maintain precise speed and positioning. Line handlers must adjust tension on the lines as water levels rise or fall within the chambers.6:25 The transit concludes in the Pacific Ocean, where the advisor departs the vessel.14:36 Proper line management and coordination with the canal advisor are essential for navigating the locks safely.

Assistir no YouTube

Barcos neste vídeo

Leopard 50Visitado

Mais de Sailing Jibsea

Our Backyard Is Norway’s Most Iconic Fjord - Ep 286set. de 2026The Unpredictable Dangers of Sailing Norway's Fjords - Ep 285set. de 2026HOVERAir X1 PROMAX: 3 Month Honest Drone Reviewago. de 2026The REAL Reason We Had to Sail to Norway - Ep 284ago. de 2026

De Sailing Jibsea — veja o barco, a tripulação e cada vídeo analisado do canal.

The Sailing Directory Newsletter

Um e-mail com os melhores achados da frota — os momentos, barcos e histórias que valem o seu tempo de visualização. Insira seu endereço para receber sua própria cópia.

Reportar um problema