Sailing Learning By Doingvídeo

Passage Planning for Bass Strait. (Learning By Doing Ep217)

27 de março de 2023 · 24 min · 7K visualizações · Tasmania

O que este vídeo aborda

The crew of the catamaran *Learning By Doing* aborts a planned 320-mile passage from Eden, New South Wales, to Tasmania across the Bass Strait due to unfavorable weather forecasts and a health emergency. Using the Windy app to analyze wind gusts, swell height, and route timing, the crew identifies a high-risk window featuring 30-knot winds and 3-meter seas.5:12 A diagnosis of shingles further complicates the decision, as the physical toll would hinder the crew's ability to manage the vessel in heavy conditions.17:35 Confirmation of the decision comes after a 47-foot monohull, *Popeye*, completes the same passage in 30- to 50-knot gusts and 5- to 6-meter swells, validating the crew's choice to avoid the crossing.20:30 With the season turning and the standing rigging requiring replacement, the crew cancels the Tasmania trip to head north toward Cronulla for repairs.22:12 Prioritizing conservative passage planning and vessel limitations over a tight schedule prevents potential equipment failure and crew exhaustion.

Assistir no YouTube

Mais de Sailing Learning By Doing

How to CHEAPLY transport a 10m Catamaran. (Ep 318)mai. de 2026New Kids On The Dock and their huge new Cat.(Ep 317)abr. de 2026Cyclone Narelle, what actually happened?(Ep 316)mar. de 2026Cyclone Narelle, live update from our sailboat. (Ep 315)mar. de 2026

De Sailing Learning By Doing — veja o barco, a tripulação e cada vídeo analisado do canal.

The Sailing Directory Newsletter

Um e-mail com os melhores achados da frota — os momentos, barcos e histórias que valem o seu tempo de visualização. Insira seu endereço para receber sua própria cópia.

Reportar um problema