Leading the Escapadevídeo

BOATYARD CHAOS: BIG PROJECTS & UNEXPECTED SETBACKS! EP-156

5 de dezembro de 2024 · 22 min · 15K visualizações · Trinidad and Tobago

O que este vídeo aborda

The crew of the sailboat Escapade performs a series of major refit projects while hauled out in a boatyard. They remove an aging, heavy generator from the cabin, creating significant storage space and eliminating the need for ongoing maintenance.0:50 To seal the resulting through-hull openings, they hire professionals to apply five layers of fiberglass and resin, using high-density foam to fill the voids.7:06 The crew then prepares the hull for bottom paint by sanding the entire surface and applying two coats of epoxy barrier coat, with six additional layers over the repaired fiberglass sections.15:34 Other maintenance tasks include removing old vinyl lettering with a razor-blade scraper, polishing stainless steel fixtures to remove rust stains, and stripping weathered varnish from the cockpit table using chemical paint stripper.13:55 The project timeline is disrupted when the boatyard forces an unexpected move to a new location, requiring the crew to rush the application of epoxy primer before the two-part mixture hardened.19:04

Assistir no YouTube

Mais de Leading the Escapade

We Ran Out of Fuel at Night… Then Got a Scary Warning ☠️ Ep-239out. de 2026Boat Repairs, Tropical Islands & One Last Bocas Adventure! Ep-239set. de 2026Sailing Panama…We Found a Secret Jungle River 🇵🇦 Ep-237set. de 2026Living the Dream in Bocas del Toro 🌴 Sailing, Tropical Paradise & Starfishset. de 2026

De Leading the Escapade — veja o barco, a tripulação e cada vídeo analisado do canal.

The Sailing Directory Newsletter

Um e-mail com os melhores achados da frota — os momentos, barcos e histórias que valem o seu tempo de visualização. Insira seu endereço para receber sua própria cópia.

Reportar um problema