Sailing Umavídeo

We Had to RIP IT ALL Back Out — Sailing Uma [Step 211]

26 de março de 2020 · 10 min · 322K visualizações

O que este vídeo aborda

Dan and Kika renovate the navigation station and nook area on their boat, Uma, to increase storage and create a dual-workspace. They remove the existing bulkhead to open the interior space, allowing two people to sit at the nav desk simultaneously.3:42 To provide seating for the second person, they convert a previous sliding table into a reinforced bench using leftover wood from a prior renovation.4:15 The bench utilizes a sail track system inspired by the catamaran Impossible Dream, allowing it to slide along the bulkhead and fold up to convert the nook into a guest bed or workspace.5:33 The crew insulates the hull behind the new bookshelf using foam and covers it with an IKEA blind.2:46 They also reposition the chart plotter to improve visibility from the main cabin for anchor watch and install RGB lighting.8:16 The project integrates new tambour doors to match existing galley cabinetry.0:45

Assistir no YouTube

Mais de Sailing Uma

Solar Sponsor Backed Out Before Sailing Around the World !set. de 2026Our boat won’t look the same after this | Step 495ago. de 2026The ONE Thing We Disagreed on This Entire Refit | Step 494ago. de 2026We Owe You The Full Storyjul. de 2026

De Sailing Uma — veja o barco, a tripulação e cada vídeo analisado do canal.

The Sailing Directory Newsletter

Um e-mail com os melhores achados da frota — os momentos, barcos e histórias que valem o seu tempo de visualização. Insira seu endereço para receber sua própria cópia.

Reportar um problema