Sailing Catalpavídeo

Life in a Tiny home Ep 402

7 de abril de 2024 · 15 min · 9K visualizações

O que este vídeo aborda

The crew of the Catalpa completes the installation of the final through-hull fitting in the galley, marking the end of a six-month project to replace all skin fittings and valves.2:55 To address the lack of a holding tank, the crew repurposes an aluminum hydraulic tank found in the yard, modifying it with a 1.5-inch waste inlet, a vent, an inspection port, and a gravity-fed outlet.0:46 Lee fabricates a custom aluminum frame to mount the tank within the engine bay and uses an Eastwood welder to attach the fittings, noting the difficulty of welding thin aluminum contaminated with oil residue.10:24 The engine bay is further reorganized to accommodate the new tank, a generator, and a custom-built rack for electric bike storage.8:11 Additionally, Lee replaces an obsolete generator controller with a new monitor, manually fabricating a wiring harness using individual terminals and heat shrink after the original plugs were lost.14:26 The boat is now structurally prepared for relaunch.3:17

Assistir no YouTube

Mais de Sailing Catalpa

arriving to the most remote atolls on earth...the Tuamotusset. de 2026they weren't expecting thisset. de 2026one of the most remote islands on the planetset. de 202629 days sailing Panama to French Polynesia the whole passageago. de 2026

De Sailing Catalpa — veja o barco, a tripulação e cada vídeo analisado do canal.

The Sailing Directory Newsletter

Um e-mail com os melhores achados da frota — os momentos, barcos e histórias que valem o seu tempo de visualização. Insira seu endereço para receber sua própria cópia.

Reportar um problema