59° North Sailingvídeo
Matt Rutherford // A Near-Sinking En Route to Bermuda
4 de março de 2025 · 1h 17m · 515 visualizações
O que este vídeo aborda
During a delivery from the U.S. East Coast to Bermuda in early December, a J/40 racer-cruiser developed a severe rudder-post leak that nearly caused the vessel to sink.18:27 The leak originated from a stainless steel component that shifted up the rudder shaft, breaking the watertight seal and allowing the rudder post to clunk violently against the hull in heavy seas.0:08 As the boat pitched in gale-force winds, water surged through the opening at a rate that overwhelmed the primary 2,000-gallon-per-hour bilge pumps.30:16 The crew hove to for several days to reduce the force of water entering the hull while waiting for a low-pressure system to pass.31:07 They maintained communication with Bermuda Radio and the U.S. Coast Guard throughout the nine-day transit.46:13 The crew eventually stabilized the leak by securing screws at the top of the rudder assembly and maintained enough battery power to run the bilge pumps by managing fuel consumption for the alternator.43:42 They successfully reached Bermuda despite the worsening structural damage.59:54 Heaving to in heavy weather significantly reduces the volume of water forced through hull breaches during a structural failure.
Barcos neste vídeo
Mais de 59° North Sailing
De 59° North Sailing — veja o barco, a tripulação e cada vídeo analisado do canal.
The Sailing Directory Newsletter
Um e-mail com os melhores achados da frota — os momentos, barcos e histórias que valem o seu tempo de visualização. Insira seu endereço para receber sua própria cópia.



