BoatworksTodayvídeo

Transom Jigsaw Puzzles

14 de fevereiro de 2021 · 10 min · 24K visualizações

O que este vídeo aborda

Repairing a curved, uneven transom requires leveling multiple elevations before installing Kusa core material. The transom features three distinct depth zones, with a center section protruding nearly an inch beyond the surrounding areas.1:35 To achieve a flush surface, the plan involves grinding down the high spots and filling the lower sections with custom-cut Kusa pieces to create a uniform plane.1:58 This process risks sanding through the thin exterior skin, which measures approximately a quarter-inch thick in the center.3:39 Once the surface is leveled, a larger, multi-layered sheet of Kusa will be applied to the main area.5:29 Because the lower transom juts out further, a separate piece will be required for the bottom section, necessitating a seam.6:20 Structural integrity will be maintained by extending stringers back to the transom and potentially adding a center knee.7:10 The final approach remains subject to change based on feedback before the epoxy application begins.8:10

Assistir no YouTube

Mais de BoatworksToday

Why Is My 920Ah Sailboat Battery Bank So Big FOR THIS TINY SAILBOAT?? This Is Why ;-)!out. de 2026New Epoch Batteries Just Landed for My Victron System But It's On Hold For Annapolis Boat Show Prep!set. de 2026I Was Wrong About My Boat's Victron Wiring (You Were Right!)set. de 2026Will This Entire Victron Electrical System Fit In My Little Boat?ago. de 2026

De BoatworksToday — veja o barco, a tripulação e cada vídeo analisado do canal.

The Sailing Directory Newsletter

Um e-mail com os melhores achados da frota — os momentos, barcos e histórias que valem o seu tempo de visualização. Insira seu endereço para receber sua própria cópia.

Reportar um problema