Mais
Idioma
Modo de exibição
Salt & Tarvídeo
12 de fevereiro de 2026 · 32 min · 43K visualizações
O que este vídeo aborda
Garrett and Ruth are hauling out their George Buehler gaff-rigged wooden boat for a major refit aimed at sailing beyond Mexico, with the stated goal of reducing maintenance and improving efficiency before relaunch.▶ 0:46 The primary work is stripping and regrinding the deck planking: Garrett chips, sands, and angle-grinds thick epoxy residue across the side decks, pairing an angle grinder with a shop vac and HEPA filter to control fiberglass dust.▶ 2:12 A full additional layer of fiberglass will reinforce the deck and cabin once the surface prep is complete.▶ 0:22 The couple rents a boatyard apartment for under $600 a month as a clean workspace and living space, a deliberate choice after learning that living aboard during heavy construction kills productivity.▶ 3:52 A parallel project takes shape during the episode: Garrett and Ruth measure the foredeck to plan a new foc's'le cabin, debating footprint dimensions between two beams and settling on a narrower, more practical layout that requires cutting only one beam and running two carlins.▶ 15:45 They also plan to retain wood decking forward of the windlass for durability with anchor chain, add a raised lip to drain dirty chain water off the main deck, and build a fife rail around the mast with belaying pins and at least two self-tailing winches to handle gaff-rig halyards efficiently.▶ 20:15 Their refit mantra is "efficient simplicity."▶ 24:00
Mais de Salt & Tar
De Salt & Tar — veja o barco, a tripulação e cada vídeo analisado do canal.