Sailing Zephyrvídeo
Intracoastal Waterway (ICW)...Is it worth the HOURS on our Sailboat ENGINE? |Sailing Zephyr - Ep.254
20 de setembro de 2024 · 12 min · 5K visualizações · Neuse River
O que este vídeo aborda
James and Natalie navigate the final 20 miles of the Atlantic Intracoastal Waterway to reach a marina in New Bern, North Carolina.0:28 After relying on the engine for a long transit due to unfavorable weather, the crew deploys the Genoa to sail the final stretch on the Neuse River.3:13 They adjust the jib car position to increase sail belly for downwind performance.3:43 Upon arrival, the crew executes a stern-in, port-side tie in a tight marina slip while contending with wind pushing the boat off the dock.9:11 A dockmaster assists by securing the stern and midship lines.9:51 The crew plans to remain at the marina for an extended period to perform general maintenance and boat improvements.11:53 During the transit, the crew also trims the nails of their two dogs to prevent clicking on the deck.8:45
Mais de Sailing Zephyr
De Sailing Zephyr — veja o barco, a tripulação e cada vídeo analisado do canal.
The Sailing Directory Newsletter
Um e-mail com os melhores achados da frota — os momentos, barcos e histórias que valem o seu tempo de visualização. Insira seu endereço para receber sua própria cópia.



