Sailing Zephyrvídeo

Intracoastal Waterway (ICW)...Is it worth the HOURS on our Sailboat ENGINE? |Sailing Zephyr - Ep.254

20 de setembro de 2024 · 12 min · 5K visualizações · Neuse River

O que este vídeo aborda

James and Natalie navigate the final 20 miles of the Atlantic Intracoastal Waterway to reach a marina in New Bern, North Carolina.0:28 After relying on the engine for a long transit due to unfavorable weather, the crew deploys the Genoa to sail the final stretch on the Neuse River.3:13 They adjust the jib car position to increase sail belly for downwind performance.3:43 Upon arrival, the crew executes a stern-in, port-side tie in a tight marina slip while contending with wind pushing the boat off the dock.9:11 A dockmaster assists by securing the stern and midship lines.9:51 The crew plans to remain at the marina for an extended period to perform general maintenance and boat improvements.11:53 During the transit, the crew also trims the nails of their two dogs to prevent clicking on the deck.8:45

Assistir no YouTube

Mais de Sailing Zephyr

We Finally Fixed the Worst-Looking Part of Our Boat Ep. 277jun. de 2026We Somehow Made It To The Bahamas...Then The Boat Work Started - Ep.276jun. de 2026Our New Boat Finally Hits The Water - Ep. 275mai. de 2026The Reality of Getting This Boat Ready - Ep. 274mai. de 2026

De Sailing Zephyr — veja o barco, a tripulação e cada vídeo analisado do canal.

The Sailing Directory Newsletter

Um e-mail com os melhores achados da frota — os momentos, barcos e histórias que valem o seu tempo de visualização. Insira seu endereço para receber sua própria cópia.

Reportar um problema