Sampson Boat Covídeo

Hanging TALLY HO’s Rudder

24 de junho de 2023 · 18 min · 523K visualizações

O que este vídeo aborda

Zeal shapes a new rudder for the Tally Ho using Purpleheart, a dense tropical hardwood.2:07 He uses an adze and power tools to profile the leading edge and feather the prop aperture for hydrodynamic efficiency.1:52 To ensure alignment of the gudgeons and pintles, the team uses a string line threaded through aluminum discs.6:12 During the first attempt to hang the rudder, the pintles fail to seat fully into the gudgeons due to tight tolerances.8:12 After fine-tuning the pintle positions and lapping the metal surfaces to increase clearance, the team successfully hoists and seats the rudder on the stern.8:28 Additional work includes fitting cap rail sections, including a wider section for the pin rail, and preparing the hull for final paint by filling seams with topside compound.16:58

Assistir no YouTube

Mais de Sampson Boat Co

Tally Ho meets a tidal mud-berth!set. de 2026Tally Ho sails into England after 59 years overseas!ago. de 2026A very brief update from the Fal estuaryago. de 2026Piracy and Peril - stories from the boatyards of West Corkago. de 2026

De Sampson Boat Co — veja o barco, a tripulação e cada vídeo analisado do canal.

The Sailing Directory Newsletter

Um e-mail com os melhores achados da frota — os momentos, barcos e histórias que valem o seu tempo de visualização. Insira seu endereço para receber sua própria cópia.

Reportar um problema