Lady K Sailingvídeo
Rewire All The Things - Episode 93 - Lady K Sailing
5 de junho de 2020 · 15 min · 9K visualizações
O que este vídeo aborda
Tim prepares the 38-ft sailboat Lady K for the season by rewiring the DC panel, mast-step bus bar, and fresh water pump circuits.0:25 He installs a Nature's Head composting toilet and adds a backlight to the unit to monitor fluid levels.2:38 To prepare the mast for stepping, he removes old, zip-tied wiring and installs new circuits for spreader lights and an Atwood anchor light.7:19 He uses the old wire as a snake to pull the new lines through the mast.6:09 After stepping the mast using a gin pole, he discovers he omitted two halyards and must drop the mast again to install them.11:15 Additionally, he assists a friend in rebuilding the carburetor on a 1970s Mercury 7.5-hp outboard motor, though the engine requires a new impeller before it can be run safely.10:19 The project concludes with the mast successfully stepped and the boat systems operational for potential summer cruising in Lake Huron.11:11
Barcos neste vídeo
Mais de Lady K Sailing
De Lady K Sailing — veja o barco, a tripulação e todos os vídeos analisados do canal.
The Sailing Directory Newsletter
Um email com os melhores achados da frota — os momentos, barcos e histórias que valem o seu tempo de visualização. Insira o seu endereço para receber a sua cópia.



