Lady K Sailingvidéo
Rewire All The Things - Episode 93 - Lady K Sailing
5 juin 2020 · 15 min · 9K vues
Ce que couvre cette vidéo
Tim prepares the 38-ft sailboat Lady K for the season by rewiring the DC panel, mast-step bus bar, and fresh water pump circuits.0:25 He installs a Nature's Head composting toilet and adds a backlight to the unit to monitor fluid levels.2:38 To prepare the mast for stepping, he removes old, zip-tied wiring and installs new circuits for spreader lights and an Atwood anchor light.7:19 He uses the old wire as a snake to pull the new lines through the mast.6:09 After stepping the mast using a gin pole, he discovers he omitted two halyards and must drop the mast again to install them.11:15 Additionally, he assists a friend in rebuilding the carburetor on a 1970s Mercury 7.5-hp outboard motor, though the engine requires a new impeller before it can be run safely.10:19 The project concludes with the mast successfully stepped and the boat systems operational for potential summer cruising in Lake Huron.11:11
Bateaux dans cette vidéo
Plus de vidéos de Lady K Sailing
De Lady K Sailing — voir le bateau, l'équipage et chaque vidéo analysée de la chaîne.
The Sailing Directory Newsletter
Un e-mail avec les meilleures trouvailles de la flotte — les moments, les bateaux et les histoires qui valent la peine d'être regardés. Entrez votre adresse pour recevoir votre propre exemplaire.



