Sailing Parlay Revivalvídeo

CRACKED BULKHEAD REPAIR SERIES - Part 4 (Episode 109)

16 de maio de 2021 · 15 min · 316K visualizações · Linton Bay Marina

O que este vídeo aborda

To repair catastrophic bulkhead failure on a 45-foot catamaran, the crew uses a travel lift and custom-built support pillars to straighten the hulls, which had bent significantly out of shape. After hauling the boat, the team identifies that the hulls have been forced upward, preventing the salon doors from closing and causing structural cracking.1:09 By loosening the shrouds and turnbuckles to remove tension, the crew uses the travel lift to incrementally lower the boat onto four support pillars.5:40 They apply 3M 5200 adhesive between the hull and deck to secure the cockpit floor as the structure settles.4:31 Through repeated, controlled adjustments of the lift and monitoring of hull measurements, the boat returns to a level position, closing a 40-millimeter gap.13:03 The process relies on the vessel's own weight to settle the structure over a weekend.12:46 Once the hulls reach a plumb state, the crew prepares to fiberglass the repaired bulkheads.14:53

Ver no YouTube

Barcos neste vídeo

Lagoon 450O barco deles

Mais de Sailing Parlay Revival

Spontaneous trip to Canada to visit a special someone! - (Episode 379)08/2026Every Sailor Needs This Lightning Protection System! - Part 2 - (Episode 378)08/2026Installing the Ultimate Lightning Protection System! - Part 1 - (Episode 377)08/2026From Military Sniper to Sailing Around the World - (Episode 376)08/2026

De Sailing Parlay Revival — veja o barco, a tripulação e todos os vídeos analisados do canal.

The Sailing Directory Newsletter

Um email com os melhores achados da frota — os momentos, barcos e histórias que valem o seu tempo de visualização. Insira o seu endereço para receber a sua cópia.

Reportar um problema