Sailing Parlay Revivalvidéo

CRACKED BULKHEAD REPAIR SERIES - Part 4 (Episode 109)

16 mai 2021 · 15 min · 316K vues · Linton Bay Marina

Ce que couvre cette vidéo

To repair catastrophic bulkhead failure on a 45-foot catamaran, the crew uses a travel lift and custom-built support pillars to straighten the hulls, which had bent significantly out of shape. After hauling the boat, the team identifies that the hulls have been forced upward, preventing the salon doors from closing and causing structural cracking.1:09 By loosening the shrouds and turnbuckles to remove tension, the crew uses the travel lift to incrementally lower the boat onto four support pillars.5:40 They apply 3M 5200 adhesive between the hull and deck to secure the cockpit floor as the structure settles.4:31 Through repeated, controlled adjustments of the lift and monitoring of hull measurements, the boat returns to a level position, closing a 40-millimeter gap.13:03 The process relies on the vessel's own weight to settle the structure over a weekend.12:46 Once the hulls reach a plumb state, the crew prepares to fiberglass the repaired bulkheads.14:53

Regarder sur YouTube

Bateaux dans cette vidéo

Lagoon 450Leur bateau

Plus de vidéos de Sailing Parlay Revival

Spontaneous trip to Canada to visit a special someone! - (Episode 379)août 2026Every Sailor Needs This Lightning Protection System! - Part 2 - (Episode 378)août 2026Installing the Ultimate Lightning Protection System! - Part 1 - (Episode 377)août 2026From Military Sniper to Sailing Around the World - (Episode 376)août 2026

De Sailing Parlay Revival — voir le bateau, l'équipage et chaque vidéo analysée de la chaîne.

The Sailing Directory Newsletter

Un e-mail avec les meilleures trouvailles de la flotte — les moments, les bateaux et les histoires qui valent la peine d'être regardés. Entrez votre adresse pour recevoir votre propre exemplaire.

Signaler un problème