DrakeParagonvídeo

Eclectic Energy D400 Wind Generator Installation (Part 2)

2 de outubro de 2018 · 19 min · 19K visualizações · Vestmana, Faroe Islands

O que este vídeo aborda

The installation of a D400 wind generator on a custom stainless steel Schedule 40 pipe involves assembling the propeller blades, rotor hub, and tail assembly before mounting the unit to the mast.2:22 The propeller assembly requires aligning the rotor hub spacer with the shaft holes and securing it with thread-locked button head screws and shake-proof washers.4:43 To connect the generator to the boat's electrical system, a block connector joins the unit's thin output wires to heavier-gauge cables, which are then protected with self-amalgamating tape to prevent condensation.13:10 A strain-relief system using wire ties and an eye bolt installed in the tower liner prevents tension on the electrical connections.13:45 The final mounting requires feeding the cables through the support post while securing the tower liner with tapped Allen key bolts.16:44 Proper alignment of the rotor hub spacer holes with the shaft is critical, as adjustments are difficult once the assembly is seated.4:18

Ver no YouTube

Barcos neste vídeo

Westsail 42O barco deles

Mais de DrakeParagon

Voyage Planning for an Early Sail - Sailing from Spain to Tunisia, Part 11 | DrakeParagon Sailing10/2026This Broke...And I'm Okay With That? Sailing from Spain to Tunisia, Part 10 | DrakeParagon Sailing08/2026Ramming Speed! - Sailing from Spain to Tunisia, Part 9 | DrakeParagon Sailing08/2026Our Sailing Apps: Sailing from Spain to Tunisia, Part 8 | DrakeParagon Sailing08/2026

De DrakeParagon — veja o barco, a tripulação e todos os vídeos analisados do canal.

The Sailing Directory Newsletter

Um email com os melhores achados da frota — os momentos, barcos e histórias que valem o seu tempo de visualização. Insira o seu endereço para receber a sua cópia.

Reportar um problema