DrakeParagonvideo

Eclectic Energy D400 Wind Generator Installation (Part 2)

2 October 2018 · 19 min · 19K views · Vestmana, Faroe Islands

What this video covers

The installation of a D400 wind generator on a custom stainless steel Schedule 40 pipe involves assembling the propeller blades, rotor hub, and tail assembly before mounting the unit to the mast.2:22 The propeller assembly requires aligning the rotor hub spacer with the shaft holes and securing it with thread-locked button head screws and shake-proof washers.4:43 To connect the generator to the boat's electrical system, a block connector joins the unit's thin output wires to heavier-gauge cables, which are then protected with self-amalgamating tape to prevent condensation.13:10 A strain-relief system using wire ties and an eye bolt installed in the tower liner prevents tension on the electrical connections.13:45 The final mounting requires feeding the cables through the support post while securing the tower liner with tapped Allen key bolts.16:44 Proper alignment of the rotor hub spacer holes with the shaft is critical, as adjustments are difficult once the assembly is seated.4:18

Watch on YouTube

Boats in this video

Westsail 42Their boat

More from DrakeParagon

Voyage Planning for an Early Sail - Sailing from Spain to Tunisia, Part 11 | DrakeParagon SailingOct 2026This Broke...And I'm Okay With That? Sailing from Spain to Tunisia, Part 10 | DrakeParagon SailingAug 2026Ramming Speed! - Sailing from Spain to Tunisia, Part 9 | DrakeParagon SailingAug 2026Our Sailing Apps: Sailing from Spain to Tunisia, Part 8 | DrakeParagon SailingAug 2026

From DrakeParagon — see the channel’s boat, crew, and every analysed video.

The Sailing Directory Newsletter

One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.

Report an issue