Epiphany Sailingvídeo

Installed Thruhull, Y Valve & Macerator Pump for Toilet Blackwater Tank pump out system C&C 39

18 de julho de 2024 · 8 min · 5K visualizações

O que este vídeo aborda

The crew of the C&C 39 Epiphany installs a macerator pump and Y-valve system to enable overboard discharge of the 35-gallon blackwater tank.2:44 Because the vessel was originally built for Great Lakes no-discharge zones, it lacked an independent pump-out system.1:38 The installation requires drilling a new through-hull fitting below the waterline, which reveals the boat's cored hull construction.1:05 The crew seals the through-hull with 3M 5200 sealant and mounts a custom 1x12 wooden platform to the hull to support the macerator pump and Y-valve.1:33 The plumbing configuration allows the tank to be emptied either via a deck-mounted pump-out fitting or through the new macerator and through-hull valve.6:38 To comply with U.S. Coast Guard regulations while in inland waters, the crew secures the Y-valve in the deck-pump-out position with a zip tie.8:27 The system is tested with saltwater to confirm the macerator functions correctly before future offshore use.7:30 Proper mounting and sealing of through-hull fittings are essential for preventing leaks and maintaining structural integrity in cored hulls.

Ver no YouTube

Barcos neste vídeo

C&C Yachts 39O barco deles

Mais de Epiphany Sailing

YOWZA ITS A THUNDERSTORM SHOWER!!!09/2026Bris 12 ft dinghy floor board repairs 04/2026Space X Rocket over Georgetown Exumas Bahamas 2/19/202602/202650 knot Blow Georgetown Exumas saved by Backup Snubber!02/2026

De Epiphany Sailing — veja o barco, a tripulação e todos os vídeos analisados do canal.

The Sailing Directory Newsletter

Um email com os melhores achados da frota — os momentos, barcos e histórias que valem o seu tempo de visualização. Insira o seu endereço para receber a sua cópia.

Reportar um problema