Sailing Umavídeo

my ugly truth | Step 353

23 de junho de 2023 · 27 min · 168K visualizações

O que este vídeo aborda

The crew of the sailboat Uma continues a major interior demolition, removing the navigation desk, galley components, and companionway steps to prepare for a redesign.1:13 To maintain access to the boat during the project, they construct a custom passerelle using thin pine laminate, fiberglass, and five-year-old epoxy resin.12:50 They test the structural integrity of the aged materials by building this platform, which they plan to finish with KiwiGrip for traction.15:35 The crew also surgically removes their watermaker, which was installed in Norway in 2021, ensuring the membranes remain pickled and sealed to prevent damage during storage.18:04 Amidst the physical labor, the crew manages the mental exhaustion of long-term boat renovation by incorporating daily guided meditation sessions using the Headspace app.8:28 The project serves as a test for reusing older supplies, including leftover bilge paint, while the crew navigates the logistical challenges of living aboard a vessel undergoing significant structural changes.24:35

Ver no YouTube

Mais de Sailing Uma

The ONE Thing We Disagreed on This Entire Refit | Step 49408/2026We Owe You The Full Story07/2026We spent $10,000 on something Pretty | Step 49307/2026We Covered Our Boat in Solar. Is It Enough? | Step 492 (Part 3)07/2026

De Sailing Uma — veja o barco, a tripulação e todos os vídeos analisados do canal.

The Sailing Directory Newsletter

Um email com os melhores achados da frota — os momentos, barcos e histórias que valem o seu tempo de visualização. Insira o seu endereço para receber a sua cópia.

Reportar um problema