Sailing Umavideo

my ugly truth | Step 353

23 de junio de 2023 · 27 min · 168K vistas

¿Qué cubre este video?

The crew of the sailboat Uma continues a major interior demolition, removing the navigation desk, galley components, and companionway steps to prepare for a redesign.1:13 To maintain access to the boat during the project, they construct a custom passerelle using thin pine laminate, fiberglass, and five-year-old epoxy resin.12:50 They test the structural integrity of the aged materials by building this platform, which they plan to finish with KiwiGrip for traction.15:35 The crew also surgically removes their watermaker, which was installed in Norway in 2021, ensuring the membranes remain pickled and sealed to prevent damage during storage.18:04 Amidst the physical labor, the crew manages the mental exhaustion of long-term boat renovation by incorporating daily guided meditation sessions using the Headspace app.8:28 The project serves as a test for reusing older supplies, including leftover bilge paint, while the crew navigates the logistical challenges of living aboard a vessel undergoing significant structural changes.24:35

Ver en YouTube

Más de Sailing Uma

We're Finally Setting Sail Again!sep 20264 Hours to Rig Solar for an 8-Month Solo Circumnavigationsep 2026Solar Sponsor Backed Out Before Sailing Around the World !sep 2026Our boat won’t look the same after this | Step 495ago 2026

De Sailing Uma — ve el barco, la tripulación y cada video analizado del canal.

The Sailing Directory Newsletter

Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que valen tu tiempo de visualización. Ingresa tu propia dirección para obtener tu propia copia.

Reportar un problema