Sailing Squibvídeo

Squib's Refit - Cable ducts - temporary to permanent - Solar extension - /118

8 de maio de 2025 · 15 min · 653 visualizações

O que este vídeo aborda

The owner of the vessel Squib upgrades the boat's electrical infrastructure by replacing narrow, cluttered cable runs with wider, permanent cable ducts.4:30 The project involves routing new wiring through the cabin, including drilling through structural stringers and enlarging existing holes near chainplates to accommodate multiple cables.9:40 To ensure a clean finish, the owner cuts the ducts at angles to sit flush against the cabin sole and uses a Dremel tool to refine openings.6:09 Beyond cable management, the owner plans to expand the solar array by installing two additional 100-watt panels on the cabin roof to support a future electric auxiliary motor.0:54 The owner also designs a battery bank layout for a mid-ship locker, aiming to maximize capacity while leaving space for a charge controller.3:25 These electrical modifications remain incomplete until the galley countertop and sink are permanently installed.15:19 Replacing disorganized wiring with structured, enclosed cable ducts significantly improves cabin aesthetics and organization.

Ver no YouTube

Mais de Sailing Squib

Sailing Squib - May 2026/309/2026Sailing Squib May 2026 /208/2026Sailing Squib - Contemporary Witness07/2026Sailing Squib - May 2026 /107/2026

De Sailing Squib — veja o barco, a tripulação e todos os vídeos analisados do canal.

The Sailing Directory Newsletter

Um email com os melhores achados da frota — os momentos, barcos e histórias que valem o seu tempo de visualização. Insira o seu endereço para receber a sua cópia.

Reportar um problema