Sailing Squibvidéo
Squib's Refit - Cable ducts - temporary to permanent - Solar extension - /118
8 mai 2025 · 15 min · 653 vues
Ce que couvre cette vidéo
The owner of the vessel Squib upgrades the boat's electrical infrastructure by replacing narrow, cluttered cable runs with wider, permanent cable ducts.4:30 The project involves routing new wiring through the cabin, including drilling through structural stringers and enlarging existing holes near chainplates to accommodate multiple cables.9:40 To ensure a clean finish, the owner cuts the ducts at angles to sit flush against the cabin sole and uses a Dremel tool to refine openings.6:09 Beyond cable management, the owner plans to expand the solar array by installing two additional 100-watt panels on the cabin roof to support a future electric auxiliary motor.0:54 The owner also designs a battery bank layout for a mid-ship locker, aiming to maximize capacity while leaving space for a charge controller.3:25 These electrical modifications remain incomplete until the galley countertop and sink are permanently installed.15:19 Replacing disorganized wiring with structured, enclosed cable ducts significantly improves cabin aesthetics and organization.
Plus de vidéos de Sailing Squib
De Sailing Squib — voir le bateau, l'équipage et chaque vidéo analysée de la chaîne.
The Sailing Directory Newsletter
Un e-mail avec les meilleures trouvailles de la flotte — les moments, les bateaux et les histoires qui valent la peine d'être regardés. Entrez votre adresse pour recevoir votre propre exemplaire.



