Sailing Catalpavídeo

No more kids on board Ep 426

3 de novembro de 2024 · 22 min · 21K visualizações · boatyard

O que este vídeo aborda

The crew of the 45-ft vessel Catalpa prepares to re-step the main and mizzen masts after a complete strip-down and refurbishment. Maintenance tasks include installing 1200-lumen Lumitech spreader lights, which require heat-shrink terminals with internal glue to prevent water ingress and corrosion.4:25 Lee uses Durilac to prevent galvanic corrosion between stainless steel rivets and the aluminum mast.18:14 During the process, the crew discovers twisted internal halyards inside the main mast.8:49 Lee resolves the tangle by using a homemade hook and a flashlight after dark, noting that low-light conditions make the internal mast structure easier to inspect.19:45 The crew also replaces pins on the water tanks and addresses damaged threads on the mizzen winch.12:13 To save costs, the owners plan to step the masts themselves with remote guidance from their rigger, Memo, via video call, rather than hiring him for on-site assistance.15:01 They aim to complete the rigging process in one hour to minimize crane rental fees.16:15

Ver no YouTube

Mais de Sailing Catalpa

arriving to the most remote atolls on earth...the Tuamotus09/2026they weren't expecting this09/2026one of the most remote islands on the planet09/202629 days sailing Panama to French Polynesia the whole passage08/2026

De Sailing Catalpa — veja o barco, a tripulação e todos os vídeos analisados do canal.

The Sailing Directory Newsletter

Um email com os melhores achados da frota — os momentos, barcos e histórias que valem o seu tempo de visualização. Insira o seu endereço para receber a sua cópia.

Reportar um problema