Sailing Catalpavidéo
No more kids on board Ep 426
3 novembre 2024 · 22 min · 21K vues · boatyard
Ce que couvre cette vidéo
The crew of the 45-ft vessel Catalpa prepares to re-step the main and mizzen masts after a complete strip-down and refurbishment. Maintenance tasks include installing 1200-lumen Lumitech spreader lights, which require heat-shrink terminals with internal glue to prevent water ingress and corrosion.4:25 Lee uses Durilac to prevent galvanic corrosion between stainless steel rivets and the aluminum mast.18:14 During the process, the crew discovers twisted internal halyards inside the main mast.8:49 Lee resolves the tangle by using a homemade hook and a flashlight after dark, noting that low-light conditions make the internal mast structure easier to inspect.19:45 The crew also replaces pins on the water tanks and addresses damaged threads on the mizzen winch.12:13 To save costs, the owners plan to step the masts themselves with remote guidance from their rigger, Memo, via video call, rather than hiring him for on-site assistance.15:01 They aim to complete the rigging process in one hour to minimize crane rental fees.16:15
Plus de vidéos de Sailing Catalpa
De Sailing Catalpa — voir le bateau, l'équipage et chaque vidéo analysée de la chaîne.
The Sailing Directory Newsletter
Un e-mail avec les meilleures trouvailles de la flotte — les moments, les bateaux et les histoires qui valent la peine d'être regardés. Entrez votre adresse pour recevoir votre propre exemplaire.



