Entre Terras e Maresvídeo

Finally the structure of the second bed is ready T1.ep 159

23 de março de 2025 · 33 min · 644 visualizações

O que este vídeo aborda

The crew of the sailboat continues the interior refit of the forward cabin, focusing on structural framing for a double berth and integrated storage. The berth measures 2.10 meters in length and 1.35 meters in width, designed to accommodate two adults.23:16 To maximize space within the narrowing hull, the team installed a raised floor platform that also creates two independent lockers beneath the berth, specifically sized to store spare sails.26:38 The construction utilizes marine-grade plywood, with structural joints reinforced using epoxy resin.15:32 Additional work includes building a large wardrobe unit adjacent to the berth and a bench seat with internal storage.18:45 The team plans to finish the interior by sealing the wood with epoxy, followed by the application of decorative laminate.25:07 Future tasks include completing the cabinetry, installing hardware, and finalizing the trim around the cabin windows.29:33

Ver no YouTube

Mais de Entre Terras e Mares

90% of the STRUCTURE is READY S1.ep 18307/2026WE FINISHED the bow cabin LAMINATE ! S1.ep18206/2026WE DID IT, WE FINISHED PART OF THE FORMICA IN THE BOW SUITE S1.ep 18106/2026This week the focus was on something else06/2026

De Entre Terras e Mares — veja o barco, a tripulação e todos os vídeos analisados do canal.

The Sailing Directory Newsletter

Um email com os melhores achados da frota — os momentos, barcos e histórias que valem o seu tempo de visualização. Insira o seu endereço para receber a sua cópia.

Reportar um problema