Sampson Boat Covídeo

We are moving out.

7 de outubro de 2023 · 16 min · 509K visualizações

O que este vídeo aborda

Leo Goolden and his crew are preparing the 1910 gaff cutter Tally Ho for its move out of the workshop shed to the yard for mast installation.0:19 To ensure the hull is watertight before exposure to the elements, the team is finalizing several deck and cockpit systems.0:23 Nick is installing bronze cockpit drain fittings, which will plumb to through-hull seacocks.0:49 Leo is drilling deck holes for diesel tank fills, utilizing a custom template to align the fittings with threaded tubes that connect directly to the tanks, eliminating the need for degrading hoses.1:59 Bob is installing the original wrought-iron mainsheet gybe buffer, or sheet horse, using a broach tool to square the mounting holes for carriage bolts.9:35 Additionally, Zeal is fabricating a bronze stem band, and Pat is glazing the skylight hatch.11:14 The crew is clearing the shed to accommodate a travel lift, which will move the vessel outside for the first time.14:20

Ver no YouTube

Mais de Sampson Boat Co

Sailing through the "Needles"10/2026Sailing the British South coast!09/2026Tally Ho meets a tidal mud-berth!09/2026Tally Ho sails into England after 59 years overseas!08/2026

De Sampson Boat Co — veja o barco, a tripulação e todos os vídeos analisados do canal.

The Sailing Directory Newsletter

Um email com os melhores achados da frota — os momentos, barcos e histórias que valem o seu tempo de visualização. Insira o seu endereço para receber a sua cópia.

Reportar um problema