Sampson Boat Covideo

We are moving out.

October 7, 2023 · 16 min · 509K views

What this video covers

Leo Goolden and his crew are preparing the 1910 gaff cutter Tally Ho for its move out of the workshop shed to the yard for mast installation.0:19 To ensure the hull is watertight before exposure to the elements, the team is finalizing several deck and cockpit systems.0:23 Nick is installing bronze cockpit drain fittings, which will plumb to through-hull seacocks.0:49 Leo is drilling deck holes for diesel tank fills, utilizing a custom template to align the fittings with threaded tubes that connect directly to the tanks, eliminating the need for degrading hoses.1:59 Bob is installing the original wrought-iron mainsheet gybe buffer, or sheet horse, using a broach tool to square the mounting holes for carriage bolts.9:35 Additionally, Zeal is fabricating a bronze stem band, and Pat is glazing the skylight hatch.11:14 The crew is clearing the shed to accommodate a travel lift, which will move the vessel outside for the first time.14:20

Watch on YouTube

More from Sampson Boat Co

Sailing through the "Needles"Oct 2026Sailing the British South coast!Sep 2026Tally Ho meets a tidal mud-berth!Sep 2026Tally Ho sails into England after 59 years overseas!Aug 2026

From Sampson Boat Co — see the channel’s boat, crew, and every analyzed video.

The Sailing Directory Newsletter

One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.

Report an issue