RAN Sailingvídeo

Deck House Interior Taking Shape: Did We Just Trap Our Boat Inside The Barn? - Ep. 436 RAN Sailing

11 de abril de 2025 · 21 min · 115K visualizações · Skåne

O que este vídeo aborda

Construction of a 50-foot sailboat interior continues with the fabrication of bulkheads for the day head and navigation station.4:09 Johan and Malin utilize 600-gram Biax fiberglass and epoxy, noting that total epoxy consumption for the project has reached 1350 kilograms.2:39 The team employs vacuum bagging for lamination, though rising ambient temperatures of 17–18 degrees Celsius complicate the curing process and limit the size of sections that can be laminated in a single session.11:30 Johan uses a shaper and cutting files to shape foam core panels, including a bulkhead that defines the deckhouse profile.14:54 This specific bulkhead confirms that the boat will have 8 centimeters of clearance beneath a structural barn beam when the hull is eventually moved on skates.20:18 The current build phase focuses on tabbing bulkheads into the hull and preparing the layout for the guest cabin, nav station, and day head.19:45

Ver no YouTube

Mais de RAN Sailing

This Is Where Boat Builds Break People - Ep. 501 Ran Sailing08/2026Our 52ft Sailboat Build Reaches Another Milestone! - Ep. 500 Ran Sailing08/2026How Many Hatches Does a 52ft Sailboat Need? - Ep. 499 Ran Sailing08/2026Making Our Sailboat One Solid Structure - Ep. 498 Ran Sailing08/2026

De RAN Sailing — veja o barco, a tripulação e todos os vídeos analisados do canal.

The Sailing Directory Newsletter

Um email com os melhores achados da frota — os momentos, barcos e histórias que valem o seu tempo de visualização. Insira o seu endereço para receber a sua cópia.

Reportar um problema