RAN Sailingvidéo
Deck House Interior Taking Shape: Did We Just Trap Our Boat Inside The Barn? - Ep. 436 RAN Sailing
11 avril 2025 · 21 min · 115K vues · Skåne
Ce que couvre cette vidéo
Construction of a 50-foot sailboat interior continues with the fabrication of bulkheads for the day head and navigation station.4:09 Johan and Malin utilize 600-gram Biax fiberglass and epoxy, noting that total epoxy consumption for the project has reached 1350 kilograms.2:39 The team employs vacuum bagging for lamination, though rising ambient temperatures of 17–18 degrees Celsius complicate the curing process and limit the size of sections that can be laminated in a single session.11:30 Johan uses a shaper and cutting files to shape foam core panels, including a bulkhead that defines the deckhouse profile.14:54 This specific bulkhead confirms that the boat will have 8 centimeters of clearance beneath a structural barn beam when the hull is eventually moved on skates.20:18 The current build phase focuses on tabbing bulkheads into the hull and preparing the layout for the guest cabin, nav station, and day head.19:45
Plus de vidéos de RAN Sailing
De RAN Sailing — voir le bateau, l'équipage et chaque vidéo analysée de la chaîne.
The Sailing Directory Newsletter
Un e-mail avec les meilleures trouvailles de la flotte — les moments, les bateaux et les histoires qui valent la peine d'être regardés. Entrez votre adresse pour recevoir votre propre exemplaire.



