Plan-Seavídeo

High Stakes Rigging: Repairing the Topping Lift Aloft | (EP. 020)

27 de setembro de 2025 · 23 min · 2K visualizações

O que este vídeo aborda

The crew of a Bristol 45.5 prepares for a transition to liveaboard life by completing several refit projects at a boatyard.0:38 They install a 12-volt Dometic fridge and freezer, requiring new wiring and a 20-amp fuse.1:40 The team upgrades the navigation suite by mounting a 12-inch BNG chartplotter into a used nav pod purchased from eBay, which requires custom fabrication using aluminum and Starboard to fit the existing pedestal.10:24 They also replace the jib halyard, spinnaker line, and main sheet by sewing new lines to the old ones and pulling them through the mast.14:04 To address a broken topping lift, one crew member goes aloft to the masthead.18:47 After failing to remove the corroded fitting with needle-nose pliers and a flathead screwdriver, he uses a chisel to break the obstruction free, successfully clearing the path for a new line.21:08 The crew also installs a new alarm system for engine and bilge monitoring and prepares for a future Starlink installation.3:23

Ver no YouTube

Barcos neste vídeo

Bristol Yachts 45.5O barco deles

Mais de Plan-Sea

S.C.U.B.A. & Sailing Back to Florida02/2026FULL TOUR of our Self-Sufficient 45' BLUEWATER SAILBOAT | Plan-Sea02/2026Crazy Underwater Find on the LAST Day Sailing the Bahamas01/2026some unfortunate news...01/2026

De Plan-Sea — veja o barco, a tripulação e todos os vídeos analisados do canal.

The Sailing Directory Newsletter

Um email com os melhores achados da frota — os momentos, barcos e histórias que valem o seu tempo de visualização. Insira o seu endereço para receber a sua cópia.

Reportar um problema