Sven Yrvindvídeo
17 Aug 2025 Back to the gimbal
16 de agosto de 2025 · 3 min · 3K visualizações
O que este vídeo aborda
Sven Yrvind installs four metal plates to support a gimbal system inside his boat.▶ 0:00 He uses an oscillating tool to trim and clean the edges of the plates to ensure they do not pose a head-strike hazard.▶ 0:39 During the fabrication process, Yrvind attempts to drill a hole in hardened steel, which causes a ceramic drill bit to break.▶ 2:06 He switches to a manual drilling method and successfully taps the hole using an M6 tap.▶ 2:47 Although the initial hole placement is too low and bottoms out, the process confirms the viability of the tapping technique for the remaining hardware.▶ 2:18 Yrvind plans to refine the gimbal mock-up and continue the installation in subsequent work sessions.▶ 3:05
Mais de Sven Yrvind
De Sven Yrvind — veja o barco, a tripulação e todos os vídeos analisados do canal.
The Sailing Directory Newsletter
Um email com os melhores achados da frota — os momentos, barcos e histórias que valem o seu tempo de visualização. Insira o seu endereço para receber a sua cópia.



