Leading the Escapadevídeo

Ignoring This Boat Upgrade Could Cost You Everything | TruDesign Install! Ep-229

8 de julho de 2026 · 23 min · 19K visualizações · Panamarina

O que este vídeo aborda

The crew of the sailboat *Escapade* replaces nine aging bronze through-hull fittings with composite TruDesign valves while hauled out at Panamarina in Panama.0:11 The team removes the original fittings by grinding four cuts into the exterior flange and using a hammer and chisel to break the seal, often requiring a heat gun to soften the old sealant.1:39 After removing the old hardware, they sand the hull back to the gel coat, apply a barrier coat to protect exposed fiberglass, and use a mixture of epoxy resin and cabosil to fill any uneven divots.3:11 They dry-fit the new composite fittings to ensure proper alignment of the ball valve handles, then use calipers to measure and cut the threaded stems to the correct length.11:35 To prevent thread damage during cutting, they thread a nut onto the fitting before using a hacksaw.12:51 The final installation uses 3M 4200 sealant on the threads to secure the valves in the desired orientation.20:18

Ver no YouTube

Mais de Leading the Escapade

WE’RE BACK AT SEA! 🌴 San Blas, Boat Repairs & Insurance Update! Ep-23509/2026Back on the Water in Bocas del Toro… 🌴 Ep-23408/2026We Had No Choice But to Let Them Lift Our Boat Again… Ep-23308/2026They Damaged Our Boat… And We Were Left To Fix It! Ep-23208/2026

De Leading the Escapade — veja o barco, a tripulação e todos os vídeos analisados do canal.

The Sailing Directory Newsletter

Um email com os melhores achados da frota — os momentos, barcos e histórias que valem o seu tempo de visualização. Insira o seu endereço para receber a sua cópia.

Reportar um problema