SmoCo Sailingvídeo
[Ep 14] Solar Arch DIY, This Time We Finish But Break Something Else | Part 2
29 de junho de 2025 · 26 min · 2K visualizações · Shelter Island
O que este vídeo aborda
Armand and Liya install a custom aluminum solar arch on their sailboat, *Cosmo*, while moored in a marina. The project requires extensive structural modifications, including removing teak trim and fiberglass to access the stern lazarettes for mounting the arch feet.▶ 2:37 The couple struggles with precise alignment, repeatedly hoisting the arch with halyards to trim the legs and drill mounting holes.▶ 7:52 They encounter significant difficulty securing the feet due to the boat's curved hull and the lack of clear manufacturer instructions.▶ 14:33 To achieve a secure fit, they use ratchet straps to tension the aluminum frame and employ custom backing plates with thread-locking adhesive inside the cramped lazarette compartments.▶ 13:52 After several days of labor, they successfully bolt the arch to the hull and prepare to mount the solar panels.▶ 23:41 The installation proves physically demanding, requiring the crew to contort into tight spaces and manage metal-on-metal tensioning issues.▶ 16:59
Mais de SmoCo Sailing
De SmoCo Sailing — veja o barco, a tripulação e todos os vídeos analisados do canal.
The Sailing Directory Newsletter
Um email com os melhores achados da frota — os momentos, barcos e histórias que valem o seu tempo de visualização. Insira o seu endereço para receber a sua cópia.



