Entre Terras e Maresvídeo

WE DID IT!! We finished the dinette cabinet finishing! S1.ep152

2 de fevereiro de 2025 · 13 min · 431 visualizações

O que este vídeo aborda

Edgar finishes the interior cabinetry for the dinette on the port side, completing the structural framing and finishing work.8:25 To prepare for the installation, he routes electrical conduits through the cabinet structure before sealing the panels.0:19 When a hole for the conduit proves too small, he uses a smaller hole saw as a guide inside a larger one to enlarge the opening, a technique that improves precision when using a hole saw.3:16 He secures the conduits to the Cambará wood structure using screw-in cable ties and identifies the lines for 12V DC and AC power using colored zip ties.5:48 Before final assembly, he treats the Cambará wood with resin to prevent termite damage.7:07 The project concludes with the installation of the cabinet door and hinges, leaving only the final shelf height to be determined.12:20

Ver no YouTube

Mais de Entre Terras e Mares

90% of the STRUCTURE is READY S1.ep 18307/2026WE FINISHED the bow cabin LAMINATE ! S1.ep18206/2026WE DID IT, WE FINISHED PART OF THE FORMICA IN THE BOW SUITE S1.ep 18106/2026This week the focus was on something else06/2026

De Entre Terras e Mares — veja o barco, a tripulação e todos os vídeos analisados do canal.

The Sailing Directory Newsletter

Um email com os melhores achados da frota — os momentos, barcos e histórias que valem o seu tempo de visualização. Insira o seu endereço para receber a sua cópia.

Reportar um problema