3 Weeks Till Splash: Making The Best of a Bad Situation | Wildling Sailing

11 de agosto de 2023 · 26 min · 133K visualizações · Amsterdam

O que este vídeo aborda

Restoration work on a Wharram Pahi 42 catamaran focuses on hull preparation and plumbing installation ahead of a scheduled launch. The project involves sanding the hull to key the existing hard antifouling and filling surface pits with fairing compound to address erosion caused by 15 years of sitting in a shallow, mud-bottomed anchorage.20:40 The hull requires two coats of two-component epoxy primer to seal areas worn down to bare fiberglass before applying the final topcoat.25:47 Additional tasks include fabricating engine sleds and installing a new galley sink system, which incorporates a foot-operated freshwater pump, flexible bilge-mounted water tank, and associated plumbing fittings.17:43 The host manages these repairs alongside temporary fixes to a water-damaged dinghy transom using Sikaflex and screws.5:23 Assistance from volunteers accelerates the sanding process, which requires microfiber cleaning to remove paint dust before painting.19:48

Ver no YouTube

Mais de Wildling Sailing

One Step Back, One Step Sideways & One Step Forward | My Budget Catamaran Refit10/2026I Lifted Her Out For a Very Important Rebuild.09/2026One Final Refit Before Crossing The Atlantic.08/20262 Days Alone at Sea On my Primitive Double-Canoe.08/2026

De Wildling Sailing — veja o barco, a tripulação e todos os vídeos analisados do canal.

The Sailing Directory Newsletter

Um email com os melhores achados da frota — os momentos, barcos e histórias que valem o seu tempo de visualização. Insira o seu endereço para receber a sua cópia.

Reportar um problema