Wildling Sailingvideo

3 Weeks Till Splash: Making The Best of a Bad Situation | Wildling Sailing

August 11, 2023 · 26 min · 133K views · Amsterdam

What this video covers

Restoration work on a Wharram Pahi 42 catamaran focuses on hull preparation and plumbing installation ahead of a scheduled launch. The project involves sanding the hull to key the existing hard antifouling and filling surface pits with fairing compound to address erosion caused by 15 years of sitting in a shallow, mud-bottomed anchorage.20:40 The hull requires two coats of two-component epoxy primer to seal areas worn down to bare fiberglass before applying the final topcoat.25:47 Additional tasks include fabricating engine sleds and installing a new galley sink system, which incorporates a foot-operated freshwater pump, flexible bilge-mounted water tank, and associated plumbing fittings.17:43 The host manages these repairs alongside temporary fixes to a water-damaged dinghy transom using Sikaflex and screws.5:23 Assistance from volunteers accelerates the sanding process, which requires microfiber cleaning to remove paint dust before painting.19:48

Watch on YouTube

More from Wildling Sailing

One Step Back, One Step Sideways & One Step Forward | My Budget Catamaran RefitOct 2026I Lifted Her Out For a Very Important Rebuild.Sep 2026One Final Refit Before Crossing The Atlantic.Aug 20262 Days Alone at Sea On my Primitive Double-Canoe.Aug 2026

From Wildling Sailing — see the channel’s boat, crew, and every analyzed video.

The Sailing Directory Newsletter

One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.

Report an issue