kentblairlvideo
Alcort Super Sailfish ZSA ZSA 13 Dec 18 Rub Rail and Toe Rail
December 13, 2018 · 10 min · 70 views
What this video covers
Kent Blair installs a new rub rail and toe rail on an Alcort Super Sailfish named Zsa Zsa using primed pine trim sourced from Lowe's.0:01 He cuts the toe rail to a width of three-quarters of an inch to allow it to overlap the rub rail, creating a sealed seam at the deck edge.0:43 During the dry-fit process, he drills pilot holes every three inches along the curved sections of the bow and every 12 to 16 inches along the straight runs.1:04 He uses number six by three-quarter-inch silicone bronze screws to secure the trim, adjusting the pilot bit depth to prevent the pine from splitting.1:57 The final installation involves applying thickened epoxy between the trim and the hull, with the epoxy serving as the primary structural fastener once cured.5:43 Blair angles the ends of the trim pieces at the bow to ensure a clean fit before final fairing.9:37
Boats in this video
More from kentblairl
From kentblairl — see the channel’s boat, crew, and every analyzed video.
The Sailing Directory Newsletter
One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.



