kentblairlvideo

Alcort Super Sailfish ZSA ZSA 13 Dec 18 Rub Rail and Toe Rail

December 13, 2018 · 10 min · 70 views

What this video covers

Kent Blair installs a new rub rail and toe rail on an Alcort Super Sailfish named Zsa Zsa using primed pine trim sourced from Lowe's.0:01 He cuts the toe rail to a width of three-quarters of an inch to allow it to overlap the rub rail, creating a sealed seam at the deck edge.0:43 During the dry-fit process, he drills pilot holes every three inches along the curved sections of the bow and every 12 to 16 inches along the straight runs.1:04 He uses number six by three-quarter-inch silicone bronze screws to secure the trim, adjusting the pilot bit depth to prevent the pine from splitting.1:57 The final installation involves applying thickened epoxy between the trim and the hull, with the epoxy serving as the primary structural fastener once cured.5:43 Blair angles the ends of the trim pieces at the bow to ensure a clean fit before final fairing.9:37

Watch on YouTube

Boats in this video

Alcort SailfishTheir boat

More from kentblairl

Bahamas Dinghy HENNING Tape RemovalSep 2026Nutshell Pram Tiller Repair IIJun 2026Nutshell Pram Tiller RepairJun 2026Bottle Jack ServicingMay 2026

From kentblairl — see the channel’s boat, crew, and every analyzed video.

The Sailing Directory Newsletter

One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.

Report an issue