Sailing Yabávideo
Boat restoration diaries: what it really looks like to face the high and lows — Sailing Yabá 181
January 27, 2024 · 19 min · 68K views
What this video covers
Ben and MP continue the restoration of their wooden two-masted schooner, Yabá, in a Brazilian shipyard.Watch The crew installs two bronze through-hull fittings for the forward starboard head, using Sikaflex to seal the connections.0:36 They plan to install additional through-hulls for the bilge pumps once the fittings return from a machine shop.0:30 To manage the 24-volt electrical system for a bow locker pump, they utilize a relay system to minimize voltage drop over a 12-meter wire run, borrowing power from an existing bus bar previously installed for the anchor windlass.9:05 The crew protects electrical connections in the bilge and bow locker using waterproof Wago gel boxes.9:56 Work is frequently interrupted by high humidity, extreme heat, and sudden tropical rainstorms, which necessitate covering the unsealed bow locker hatch with a tarp.12:12 The project remains in the final stages of preparation for launch.
More from Sailing Yabá
From Sailing Yabá — see the channel’s boat, crew, and every analyzed video.
The Sailing Directory Newsletter
One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.



