Sailing Yabávideo

Boat restoration diaries: what it really looks like to face the highs and lows — Sailing Yabá 181

27 January 2024 · 19 min · 68K views

What this video covers

Ben and MP continue the restoration of their wooden two-masted schooner, Yabá, in a Brazilian shipyard.Watch The crew installs two bronze through-hull fittings for the forward starboard head, using Sikaflex to seal the connections.0:36 They plan to install additional through-hulls for the bilge pumps once the fittings return from a machine shop.0:30 To manage the 24-volt electrical system for a bow locker pump, they utilise a relay system to minimise voltage drop over a 12-metre wire run, borrowing power from an existing bus bar previously installed for the anchor windlass.9:05 The crew protects electrical connections in the bilge and bow locker using waterproof Wago gel boxes.9:56 Work is frequently interrupted by high humidity, extreme heat, and sudden tropical rainstorms, which necessitate covering the unsealed bow locker hatch with a tarp.12:12 The project remains in the final stages of preparation for launch.

Watch on YouTube

More from Sailing Yabá

Is a Huge Crew Always Better? (Bittersweet Voyage Surrounded by Whales) — Sailing YabáOct 2026Yabá gets Brand New Sails & Set Sail Immediately!— Sailing YabáOct 2026Everything Has to be Perfect: Preparing the Rig for Brand New Sails — Sailing YabáSept 2026Our Sails Ripped on Their Last Journey Before a Massive Upgrade! — Sailing YabáSept 2026

From Sailing Yabá — see the channel’s boat, crew, and every analysed video.

The Sailing Directory Newsletter

One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.

Report an issue