RAN Sailingvideo

New Phase Unlocked: Starting with the deck - Ep. 439 RAN Sailing

May 2, 2025 · 20 min · 116K views · Skåne

What this video covers

Construction of a custom boat continues with the fabrication of two structural deck beams designed to support the deck salon area.10:40 To maintain ceiling height, the builder replaces an initial design using 100mm PET foam with 50mm oak planks, reinforced with unidirectional carbon fiber for stiffness.11:36 After a router error ruins one oak piece, a replacement is milled and shaped to match the 3D design curves.14:09 To prevent the beams from warping during the curing process, the builder opts for hand lamination with peel ply rather than vacuum bagging, using plastic wrap to consolidate the carbon fiber layers.16:24 Additional interior work includes fitting bulkheads for a day head and a wet locker, with the sole height adjusted to increase guest cabin mattress thickness.7:44 The project now shifts focus to the forward deck, which serves as a test area for interior installation methods and material systems.9:40

Watch on YouTube

More from RAN Sailing

This Is Where Boat Builds Break People - Ep. 501 Ran SailingAug 2026Our 52ft Sailboat Build Reaches Another Milestone! - Ep. 500 Ran SailingAug 2026How Many Hatches Does a 52ft Sailboat Need? - Ep. 499 Ran SailingAug 2026Making Our Sailboat One Solid Structure - Ep. 498 Ran SailingAug 2026

From RAN Sailing — see the channel’s boat, crew, and every analyzed video.

The Sailing Directory Newsletter

One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.

Report an issue