Salt & Tarvideo

Salt & Tar: Ep.346- Monumentous IS a Word

June 18, 2026 · 30 min · 48K views

What this video covers

Garrett and Ruth complete two of the most labor-intensive stages of a five-month haulout aboard Red Aviva, a George Buehler design: refastening the entire bottom with bronze screws and fiberglassing the deck and pilot house.23:44 The refastening project consumed a box of 8,000 screws from the original sheathing job plus additional pounds ordered by weight; Garrett estimates the screws have a 10-year lifespan underwater, with each one rolled in tar and driven by hand to protect the coating.0:31 Ruth finishes the final fiberglass panels on the fo'c'sle and the aft end of the pilot house, exhausting their fourth full roll of biaxial cloth.7:47 The crew drives four hours across the border into Arizona — to Phoenix, with packages held by a friend in Ajo as a backup — to collect new rudder hardware fabricated by a contact named Gary: new pintles, gudgeons, and a stern bearing housing designed with crush bolts for future bearing removal without improvised tools.9:01 The engine, with roughly 6,000 miles on it and no mechanical failures, is assessed as healthy; only external components need attention and the driveline stays as-is.4:05 With both the refastening and fiberglassing now complete, the boat moves into fairing, sanding, and paint preparation before launch.15:32

Watch on YouTube

More from Salt & Tar

Salt & Tar: Ep.357- Finishing What We StartedSep 2026Salt & Tar: Ep.356- Dock LifeAug 2026Salt & Tar: Ep.355- Serenely Afloat in a Hustling HarborAug 2026Salt & Tar: Ep.354- Enjoying the Sensation of FloatingAug 2026

From Salt & Tar — see the channel’s boat, crew, and every analyzed video.

The Sailing Directory Newsletter

One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.

Report an issue