Entre Terras e Maresvideo

Step by Step: Finishing the Pilot House Windows T1.ep141

October 27, 2024 · 14 min · 513 views

What this video covers

Edgar and Sâmia advance the interior finishing of the pilot house, focusing on the side window structures and entrance door. They apply gel primer to the interior wall surfaces to protect the wood before installing decorative wooden trim.1:32 To ensure structural integrity, Edgar reinforces the hull with three layers of 320-gram fabric and three layers of 450-gram mat on each side, increasing the thickness by 4 millimeters to handle potential impacts of up to 1 ton.5:46 The team creates cardboard templates to cut the final wooden panels for the window surrounds and installs curtain tracks on the ceiling.4:11 Because of high humidity and daily rain, they postpone final painting.0:27 The design incorporates a gap between the wall and the wooden trim to allow the curtain to run behind the structure, a configuration inspired by similar setups on Genô vessels.13:00 The project remains in the fitting stage, with final glass cutting and formica application pending.12:31

Watch on YouTube

More from Entre Terras e Mares

90% of the STRUCTURE is READY S1.ep 183Jul 2026WE FINISHED the bow cabin LAMINATE ! S1.ep182Jun 2026WE DID IT, WE FINISHED PART OF THE FORMICA IN THE BOW SUITE S1.ep 181Jun 2026This week the focus was on something elseJun 2026

From Entre Terras e Mares — see the channel’s boat, crew, and every analyzed video.

The Sailing Directory Newsletter

One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.

Report an issue