Entre Terras e Maresvideo
WE FINISHED the bow cabin LAMINATE ! S1.ep182
June 28, 2026 · 21 min · 354 views
What this video covers
Edgar and Sâmia completed the laminate interior finishing in the bow cabin of their boat, transitioning from dark surfaces to a lighter aesthetic.4:26 The project involved cutting and bonding laminate sheets to cabin walls, storage doors, and the navigation station.2:30 To maximize interior brightness, the crew used beige laminate for non-visible storage areas and the base of the bed frame.9:33 They applied edge banding to exposed sections and installed hardware, including door handles, USB ports, and lighting fixtures.8:15 The team utilized a flame-retardant, aluminum-backed insulation material called "protelhado" to line the ceiling and provide thermal protection.17:26 Future plans for the cabin include installing a reflective, mirror-like laminate sheet inside a small vanity table and adding three internal shelves to a storage locker.18:00 The cabin renovation remains ongoing, with the floor and ceiling panels still requiring final installation.18:59
More from Entre Terras e Mares
From Entre Terras e Mares — see the channel’s boat, crew, and every analyzed video.
The Sailing Directory Newsletter
One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.



