Wildling Sailingvideo

Plodding Along With the Engine Pods | Wildling Sailing

December 1, 2023 · 26 min · 120K views · The Netherlands

What this video covers

Fabrication of engine bay and cockpit support beams requires drilling and mounting steel sections to the existing boat structure.1:40 The process involves cleaning and inspecting the original beams for rot, then aligning and through-bolting new steel supports.1:57 To facilitate cutting threaded bars for these mounts, a 20-euro angle grinder stand from Lidl provides a more efficient alternative to manual hacksawing.11:06

The project also integrates an EcoFlow Wave 2 portable air conditioner and heater, paired with an EcoFlow Delta power bank and an IP68-rated bifacial solar panel.13:20 The unit functions primarily as a dehumidifier, effectively eliminating musty odors and moisture from the cabin interior.14:46 Power consumption tests show the device draws approximately 355 watts on DC power, significantly less than a standard 1700-watt fan heater.18:14 Future plans include fabricating custom chain plates to improve bulkhead attachment points.25:20

Watch on YouTube

More from Wildling Sailing

One Step Back, One Step Sideways & One Step Forward | My Budget Catamaran RefitOct 2026I Lifted Her Out For a Very Important Rebuild.Sep 2026One Final Refit Before Crossing The Atlantic.Aug 20262 Days Alone at Sea On my Primitive Double-Canoe.Aug 2026

From Wildling Sailing — see the channel’s boat, crew, and every analyzed video.

The Sailing Directory Newsletter

One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.

Report an issue