Acorn To Arabellavideo

What Goes Up Must Come Down - Episode 269 - Acorn to Arabella: Journey of a Wooden Boat

June 9, 2023 · 41 min · 154K views · Mattapoisett, Massachusetts

What this video covers

The crew prepares the wooden boat *Arabella* for launch by completing final engine and deck installations in Mattapoisett, Massachusetts. D’Angelo Marine Exhaust engineers assist in installing a custom wet exhaust system, which includes a temperature sensor to monitor water flow and engine heat.6:35 To clear the diesel tanks of contaminated water, the team constructs an adductor pump using compressed air to vacuum the remaining liquid.13:55 The cockpit installation involves gluing the edges with 4200 sealant and through-bolting the assembly to deck beams using custom washers recessed into the fiberglass and sealed with epoxy.24:05 The crew also applies Net Dip, a rubberized vinyl coating, to galvanized rigging wire to prevent corrosion.22:36 Finally, the team dismantles the long-standing wooden boathouse structure that sheltered the seven-year restoration project, leaving the vessel exposed in the yard ahead of its scheduled launch.24:57

Watch on YouTube

More from Acorn To Arabella

We Stripped Our Wooden Sailboat Back to Bare Wood... AgainOct 2026Saying Goodbye to Newfoundland—and the Man Who Inspired ArabellaSep 2026Upgrading the Rudder and Another Trek To The CliffAug 2026We're Climbing a Wall No One Has Ever Climbed Before | Rock Climbing on Newfoundland's South CoastJul 2026

From Acorn To Arabella — see the channel’s boat, crew, and every analyzed video.

The Sailing Directory Newsletter

One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.

Report an issue