Acorn To Arabellavideo
What Goes Up Must Come Down - Episode 269 - Acorn to Arabella: Journey of a Wooden Boat
June 9, 2023 · 41 min · 154K views · Mattapoisett, Massachusetts
What this video covers
The crew prepares the wooden boat *Arabella* for launch by completing final engine and deck installations in Mattapoisett, Massachusetts. D’Angelo Marine Exhaust engineers assist in installing a custom wet exhaust system, which includes a temperature sensor to monitor water flow and engine heat.6:35 To clear the diesel tanks of contaminated water, the team constructs an adductor pump using compressed air to vacuum the remaining liquid.13:55 The cockpit installation involves gluing the edges with 4200 sealant and through-bolting the assembly to deck beams using custom washers recessed into the fiberglass and sealed with epoxy.24:05 The crew also applies Net Dip, a rubberized vinyl coating, to galvanized rigging wire to prevent corrosion.22:36 Finally, the team dismantles the long-standing wooden boathouse structure that sheltered the seven-year restoration project, leaving the vessel exposed in the yard ahead of its scheduled launch.24:57
More from Acorn To Arabella
From Acorn To Arabella — see the channel’s boat, crew, and every analyzed video.
The Sailing Directory Newsletter
One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.



