Acorn To Arabellavideo
What Goes Up Must Come Down - Episode 269 - Acorn to Arabella: Journey of a Wooden Boat
9 June 2023 · 41 min · 154K views · Mattapoisett, Massachusetts
What this video covers
The crew prepares the wooden boat Arabella for launch by completing final engine and deck installations in Mattapoisett, Massachusetts. D’Angelo Marine Exhaust engineers assist in installing a custom wet exhaust system, which includes a temperature sensor to monitor water flow and engine heat.6:35 To clear the diesel tanks of contaminated water, the team constructs an adductor pump using compressed air to vacuum the remaining liquid.13:55 The cockpit installation involves gluing the edges with 4200 sealant and through-bolting the assembly to deck beams using custom washers recessed into the fibreglass and sealed with epoxy.24:05 The crew also applies Net Dip, a rubberised vinyl coating, to galvanised rigging wire to prevent corrosion.22:36 Finally, the team dismantles the long-standing wooden boathouse structure that sheltered the seven-year restoration project, leaving the vessel exposed in the yard ahead of its scheduled launch.24:57
More from Acorn To Arabella
From Acorn To Arabella — see the channel’s boat, crew, and every analysed video.
The Sailing Directory Newsletter
One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.



