Wildling Sailingvideo

Finishing The Last Structural Jobs Before Leaving…

May 16, 2025 · 34 min · 114K views · The Netherlands

What this video covers

Structural repairs on a wooden catamaran conclude with the replacement of a rotted rubbing strip, which secures the lashings for the vessel's beams.Watch The repair involves bonding a new 4-meter Meranti plank to the hull using Sikaflex and screws, followed by filling gaps and plugging screw holes with pre-made dowels.11:46 To address heavy steering, the owner installs a Naughty Neck Autopilot featuring a high-torque, low-RPM motor designed to handle the boat's specific steering loads.25:09 During sea trials in the North Sea Canal, the system maintains course in 26-knot winds, though excessive vibration from the engines necessitates software adjustments and improved vibration-dampening mounts for the control box.29:59 The owner plans to avoid motoring into heavy swells due to engine reliability concerns and intends to address remaining spongy deck sections after reaching warmer climates.30:52

Watch on YouTube

More from Wildling Sailing

One Final Refit Before Crossing The Atlantic.Aug 20262 Days Alone at Sea On my Primitive Double-Canoe.Aug 2026A Night Passage Through Orca TerritoryJul 2026Getting Very Comfortable Solo Sailing My Big CatamaranJul 2026

From Wildling Sailing — see the channel’s boat, crew, and every analyzed video.

The Sailing Directory Newsletter

One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.

Report an issue