sailing.directory
ChannelsBoatsAskAbout
🇺🇸
🇺🇸English🇬🇧English (UK)🇲🇽Español (México)🇪🇸Español (España)🇫🇷Français🇮🇹Italiano🇵🇹Português (Portugal)🇧🇷Português (Brasil)🇬🇷Ελληνικά🇳🇴Norsk
Sign in
sailing.directory

An index of sailing channels on YouTube — searchable by topic, navigable by interest. New channels and boats, indexed weekly. No noise.

Explore

ChannelsBoatsSearchAboutSuggest a channel

Creators & legal

SupportFor creatorsPrivacyTermsDMCA

Not navigation advice · © 2026

HomeChannelsBoats

More

SearchAskAboutSupportFor creatorsSign in

Language

🇺🇸English🇬🇧English (UK)🇲🇽Español (México)🇪🇸Español (España)🇫🇷Français🇮🇹Italiano🇵🇹Português (Portugal)🇧🇷Português (Brasil)🇬🇷Ελληνικά🇳🇴Norsk

Display mode

sailing.directory
ChannelsBoatsAskAbout
🇺🇸
🇺🇸English🇬🇧English (UK)🇲🇽Español (México)🇪🇸Español (España)🇫🇷Français🇮🇹Italiano🇵🇹Português (Portugal)🇧🇷Português (Brasil)🇬🇷Ελληνικά🇳🇴Norsk
Sign in

Sailing Parlay Revival · video

RAW AND UNEDITED OVERHEAD FIBERGLASSING DEMONSTRATION - (Episode 353)

March 1, 2026 · 24 min · 127K views · Rebak Island, Langkawi

Crew fibers glassing boat under tent at dawn

Watch on YouTube

What this video covers

The crew of a Lagoon 450 repairs a section of the hull from the transom to the keel by applying four layers of biaxial fiberglass.▶ 0:13 To manage the curing time in high temperatures, the team uses Total Boat Epoxy with a slow hardener, mixing it in 1.5-liter batches and transferring the resin into smaller containers to prevent premature kicking.▶ 2:01 The process involves wetting out the hull surface before applying pre-cut, numbered, and rolled fiberglass sheets to ensure precise placement.▶ 3:41 The team uses an air roller to remove trapped air bubbles and distribute excess resin, noting that any air pockets would require grinding out the cured laminate.▶ 5:09 When the fiberglass cloth stretches during application, the crew cuts small filler strips to maintain the required four-layer thickness.▶ 18:45 The repair addresses a localized area of blistering along the centerline, which the crew distinguishes from previous hurricane-related damage.▶ 3:10 The project concludes with the final tie-in to the keel, followed by the transition to the fairing stage.▶ 20:32

Boats in this video

Lagoon 450Their boat

More from Sailing Parlay Revival

We Are Building a 60ft Aluminum Catamaran FROM SCRATCH! - (Episode 370)Jun 2026Doing BULKHEAD REPAIRS again on my CATAMARAN! - (Episode 366)May 2026MY RESPONSE TO ALL THE HATERS FROM LAST WEEK.. - (Episode 364)May 2026LIVING OFF-GRID AT SEA | 26kW lithium upgrade! | (Episode 363)May 2026

From Sailing Parlay Revival — see the channel’s boat, crew, and every analyzed video.

Report an issue
HomeChannelsBoats

More

SearchAskAboutSupportFor creatorsSign in

Language

🇺🇸English🇬🇧English (UK)🇲🇽Español (México)🇪🇸Español (España)🇫🇷Français🇮🇹Italiano🇵🇹Português (Portugal)🇧🇷Português (Brasil)🇬🇷Ελληνικά🇳🇴Norsk

Display mode

sailing.directory

An index of sailing channels on YouTube — searchable by topic, navigable by interest. New channels and boats, indexed weekly. No noise.

Explore

ChannelsBoatsSearchAboutSuggest a channel

Creators & legal

SupportFor creatorsPrivacyTermsDMCA

Not navigation advice · © 2026