Sailing Squibvideo
Sailing Squib - The Holiday Begins /2
October 30, 2025 · 27 min · 1K views
What this video covers
The crew of the catamaran Squib completes final interior and deck preparations ahead of a planned departure. Sabina and her partner install a dual-faucet system in the galley, utilizing separate foot switches to control freshwater and raw water pumps.4:26 They seal the new galley sink with silicone, noting discrepancies between the product’s online listing and the provided under-mount fittings.10:05 On deck, the crew uses a pressure washer to remove accumulated river sand from the cockpit and applies new non-slip decking material to the cockpit locker lids.11:34
Mechanical and electrical tasks remain ongoing, including addressing an oil leak on one engine that prevents the final installation of the head and holding tank.17:37 The mast remains unstepped, leaving the VHF antenna disconnected until the vessel reaches the Danube Delta.20:14 Other pending items include labeling the electrical panel, connecting the gas stove, and finalizing the wiring for the navigation lights and depth sounder.18:48 Despite the remaining workload, the crew mounts a dedicated bracket for an Insta360 camera and continues organizing the interior for the upcoming voyage.19:45
More from Sailing Squib
From Sailing Squib — see the channel’s boat, crew, and every analyzed video.
The Sailing Directory Newsletter
One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.



