The Marinervideo
Removing a 120ft Mast & Hauling Osprey
June 17, 2025 · 11 min · 2K views
What this video covers
Chris prepares the 120-foot mast of his boat, *Osprey*, for removal by a professional yard crew. He strips the sails, removes the boom, and detaches the mast boot, exposing the Spa Seal epoxy dam used for partner chocks.▶ 0:57 To ensure safety and allow the professionals to work, he remains on the dock while the crane operator and yard staff pull the pins, remove the backstay, and lift the spar.▶ 1:35 The crew uses tag lines from the first spreaders to stabilize the mast during the lift, eventually using a forklift to help maneuver the 120-foot spar into a horizontal position for transport.▶ 5:58 Following the mast removal, the yard lifts the boat from the water using a crane.▶ 9:47 The initial strap configuration fails to provide enough clearance to clear the well’s lip, requiring a two-hour delay to reposition the gear.▶ 11:20 The process highlights the importance of maintaining clear communication with yard professionals and monitoring heavy machinery stability during high-leverage lifts.
More from The Mariner
From The Mariner — see the channel’s boat, crew, and every analyzed video.
The Sailing Directory Newsletter
One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.



