More
Language
Display mode
Sven Yrvindvideo
May 23, 2026 · 5 min · 2K views
What this video covers
Sven Yrvind installs ring terminals on the electrical cables of a small cruiser he is building, routing wires for navigation lights and water-collection systems.▶ 1:55 He feeds red and black ground cables through pre-drilled holes, secures them with cable ties, and crimps ring connectors onto the ends before fastening them to their respective terminals.▶ 1:05 One wire runs forward to the navigation light; others route to port and starboard water-collection points.▶ 2:48 He notes a lost nut in a tight space and sets it aside to find later.▶ 3:45 Separately, he confirms that hot-dipped galvanized chain — locally made and already on hand — suits a fitting he had previously considered using a rubber component for, replacing an earlier suggestion.▶ 0:39 He is also waiting on additional Sikaflex sealant before proceeding with other steps.▶ 0:47 The work is early-stage: ring terminals are fitted but the full wiring run is not yet complete.▶ 4:26
More from Sven Yrvind
From Sven Yrvind — see the channel’s boat, crew, and every analyzed video.